Nipissing Road
Project details:
- Widen the road to three lanes: one in each direction, plus a shared center left-turn lane
- Build a 3.5-metre-wide multi-use path for walking and cycling (north side)
- Add a 1.5-metre-wide concrete sidewalk (south side)
- Replace ditches with curbs and storm sewers, where possible
- Adjust grading and driveways (some work may be on private property)
- Upgrade 1,000 metres of sanitary sewer
- Install a new traffic light at Nipissing Road and Childs Drive
Traffic impacts:
- Traffic along the entire length of Nipissing will be allowed in the westbound direction only
- This will remain in place until the end of 2026
Work completed to-date (September 2026):
- Temporary road widening to facilitate sewer works and safe passage of traffic
- Sanitary sewer works along Nipissing completed
- Storm sewer works complete up to 180 Nipissing
Next few weeks (September to early October 2026):
- Storm sewer works along with Road construction works have commenced and will be ongoing until the end of 2026.
- Road works reconstruction works have commenced on Nipissing (from Childs to 100 Nipissing).
- To facilitate road and sewer construction, driveway access along Nipissing Road will be temporarily closed up to 3 separate times, for approximately 3 to 5 days each time. Notice’s will be provided to each property confirming date/duration and access will be maintained during business hours.
Share Nipissing Road on Facebook
Share Nipissing Road on X (formerly Twitter)
Share Nipissing Road on Linkedin
Email Nipissing Road link
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends