Nipissing Road
Project details:
- Widen the road to three lanes: one in each direction, plus a shared center left-turn lane
- Build a 3.5-metre-wide multi-use path for walking and cycling (north side)
- Add a 1.5-metre-wide concrete sidewalk (south side)
- Replace ditches with curbs and storm sewers, where possible
- Adjust grading and driveways (some work may be on private property)
- Upgrade 1,000 metres of sanitary sewer
- Install a new traffic light at Nipissing Road and Childs Drive
Traffic impacts:
- Traffic along the entire length of Nipissing will be allowed in the westbound direction only
- This will remain in place until the Fall of 2026
Work completed to-date (March 26, 2026):
- Preparation for temporary road widening to facilitate sewer work and safe passage of traffic
- Sanitary sewer work at intersection of Nipissing and Childs
Next few weeks (*April 6-18):
- To facilitate sanitary sewer installation across driveways, crews will be operating on a 12-hour shift, consisting of a 7:00 a.m. to 7:00 p.m. day shift and a 7:00 p.m. to 7:00 a.m. night shift.
- For the night work, the two driveway entrances to the Milton Mall (entrance closest to Dollarama and the delivery entrance behind Shoppers Drug Mart) will only be impacted between 9:00 p.m. and 5:30 a.m.
- Night work will only proceed once an exemption to the Noise by-law has been received.
*Excluding Saturday to Sunday nights
Share Nipissing Road on Facebook
Share Nipissing Road on Twitter
Share Nipissing Road on Linkedin
Email Nipissing Road link
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends