Childs Drive

Project details:

  • Widen the road to add two left-turn lanes onto Ontario Street South
  • Build a 1.5-metre-wide concrete sidewalk (south side, from Ontario Street to Nipissing Road)
  • Upgrade 650 metres of wastewater pipes (from Ontario Street to Satok Crescent)
  • Widen Ontario Street South to add a northbound right-turn lane onto Childs Drive
  • Update the traffic signals at Ontario Street and Childs Drive

Traffic impacts:

  • Short closures between Nipissing Road and Satok Crescent from August to September 2025
    • Local traffic will be allowed
    • No through traffic during closures
  • Two-way traffic will remain open between Ontario street and Nipissing Road from summer to winter 2026

Work completed to-date (Sept. 17, 2025):

  • Tree protection installation
  • Tree and vegetation clearing
  • Onsite signage
  • Pre-construction condition surveys

Next two weeks (Sept. 17 - Oct. 5):

  • Anticipate some localized lane closures on Childs Drive (expect some delays)
  • Pre-construction sewer video inspection
  • Traffic control signage installation for upcoming Childs Drive closures – more details to come