Childs Drive
Project details:
- Widen the road to add two left-turn lanes onto Ontario Street South
- Build a 1.5-metre-wide concrete sidewalk (south side, from Ontario Street to Nipissing Road)
- Upgrade 650 metres of wastewater pipes (from Ontario Street to Satok Crescent)
- Widen Ontario Street South to add a northbound right-turn lane onto Childs Drive
- Update the traffic signals at Ontario Street and Childs Drive
Traffic impacts:
- Childs Drive is now open to two way traffic – please obey onsite traffic control flagging
- No access to Nipissing Road from Childs Drive (In place until Fall 2026)
Work completed to-date (March 24, 2026):
- Sanitary Sewer installation completed between Nipissing and Satok (Fall 2025 to early 2026)
- Temporary restoration work (asphalt) – permanent restoration will occur this summer for private property and 2027 for roadway and sidewalk
Share Childs Drive on Facebook
Share Childs Drive on Twitter
Share Childs Drive on Linkedin
Email Childs Drive link
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends